Evaluation Criteria of Social Responsibility Audit Result Needed to Know in Factory Inspection::
验厂需要了解的社会责任审核结果评价标准:
The on-site audit result is determined by the severity and number of findings. Please refer to below table.
现场审核结果对照下表依实际发现的不符合项的数量及严重程度得出该次审核结果的评级。
Level级别 Zero Tolerance零容忍 Critical极严重 Major 严重 Minor 轻微 Remark
A 0 0-15 0-20 0-10 Prefect
B 0 0-15 21-40 11-20 Good
C 0 16-25 41-65 / Passed
D 0 26-33 66-85 / Pending
E 0 34-49 >85 / Failed
E 0 Over50 / / Failed
E >0 / / / Failed
● Level A:Prefect
The factory has fully fulfilled Factory inspection corporate social responsibility requirements, and a few findings need to be improved.
该工厂完全履行了验厂公司的企业社会责任要求,存在少量的需要改进的地方;
● Level B:Good
The factory has well fulfilled Factory inspection corporate social responsibility requirements, and a number of findings need to be improved.
该工厂良好的履行了验厂公司的企业社会责任要求,存在一定数量的需要改进的地方;
● Level C:Passed
The factory has basically fulfilled Factory inspection corporate social responsibility requirements, and a number of important findings need to be corrected. The audit result is passed.
该工厂基本履行了验厂公司的企业社会责任要求,存在比较多的需要整改的地方,结果为通过;
● Level D:Pending
The factory has meet some of Factory inspection corporate social responsibility requirements, but not enough. A lot of important findings should be corrected. Following audit result depends on whether the factory can complete the corrective action in time.
该工厂履行了一些验厂公司的企业社会责任要求,但不足够,存在大量必须整改的地方;未来工厂是否能通过验厂公司的进一步审核处决于该工厂能否及时完成整改;
● Level E:Failed
The factory may meet few of corporate social responsibility requirements, but Factory inspection corporate social responsibility requirements are not meet.
该工厂可能履行了一些企业社会责任要求,但无法满足验厂公司的企业社会责任要求。
Remark说明:
1、Critical finding The corrective action plan should be submit to CSW within 5 days, and all findings should be corrected within 90 days. 所有极严重项必须5天内回复整改计划及措施,90天内完成整改.
2、Major finding The corrective action plan should be submit to CSW within 10 days, and all findings should be corrected within 60 days.所有严重项必须10天回复整改计划,60天内完成整改.
3、Minor finding The corrective action plan should be submit to CSW within 15 days, and all findings should be corrected within 30 days.所有轻微项必须15内回复整改计划,30天内完成整改.
如果企业想做验厂辅导,不妨考虑一下创思维验厂网,创思维验厂网是专业的验厂咨询、认证辅导公司,已经为全国各地上万家企业服务过,在全国多处设有办事处,会就近安排老师进场辅导,我们的辅导原则是帮助企业通过验厂,一切以合同条款为准,不乱收费,并尽可能为企业节约成本,通过后付款!
相关资讯
-
进行深圳ICTI验厂前要注意什么问题
2017-08-31 -
RBA认证介绍,RBA认证核心原则、RBA认证实施过程及未来展望
2018-01-03 -
苹果发供应商责任报告出现多起雇佣童工案例
2017-08-02 -
盛妆起航,验厂先行--记妆胜公司顺利通过GMPC认证
2017-08-28 -
人权验厂、反恐验厂、质量体系/品质验厂的验厂小技巧和知识点
2017-12-18 -
验厂咨询教大家选择正确的灭火器
2017-08-02 -
希望国际只有一个通用的验证标准
2017-08-02 -
工厂验厂的自检表
2017-12-21 -
用二氧化碳灭火验厂咨询怎么看
2017-08-02 -
验厂咨询公司帮助客户在最快的时间和最低的成本中通过
2017-08-02